Mural Theme
The “Gateways” theme for this public art installation is a vivid celebration of intersections–both literal and metaphorical. It's embodied in the artful transformation of pillars into vibrant portals, each beckoning viewers to embark on a journey through a rich tapestry of culture, history, and ecology. These murals stand as sentinels, each one a gateway to exploration, understanding, and connection, transcending their physical form to become storytellers. This theme is an embrace of diversity and inclusivity, a reflection of the community's collective journey through its past, present, and envisioned future.
Project Locations & Specifications
The mural will be installed on 4 BART columns supporting the BART tracks at the intersection of Solano Avenue and Masonic Avenue (two columns North of Solano and two columns South of Solano). Mural artwork must cover approximately 432 square feet of surface area on 4 pillars with 6 sides, each 3 feet wide and 6 feet high. Artwork should consider the general context and translate well from all various viewing angles. Please note that there must be a cohesive aesthetic across the pillars. A final determination of the space available for the artwork on the pillars will be designated by BART.
The mural should be two dimensional and should not make use of or simulate colors or combinations of colors usually reserved for official traffic control devices. The mural should not display text, display symbols or icons, such as but not limited to flags, logos, symbols, messages, recognizable living person, e.g., no tribute murals.
Implementation of this project is subject to approval through the BART permit process, and implementation of this project is not guaranteed until the BART permit is issued.
Budget
The total budget for the proposed project should not exceed $25,000 including the artist fees, equipment, materials, and all production costs.
Time Commitment
Artist will commit to participate in the development and presentation of the proposal and project per an agreed-upon timeline. Artist will create a schedule in collaboration with the City.
Public Presentation of the Completed Mural
Upon completion of the artwork installation, the selected artist or artist team shall prepare and provide a public presentation of the work, including a demonstration or description of the methodology and techniques used in the development of the work. This presentation shall be organized with the assistance of City staff to address a diverse audience and will be scheduled on a day and time to be attended by as many park users and members of the public as possible.
Project Timeline
Applications due: June 20, 2024 (submissions closed)
Notification of finalist: September 2024
Finalist proposal due: October 2024
Community Outreach: November 2024 - January 2025
Finalist interview: December 2024
Notification of Artist Selected: February/March 2025
Installation complete: September 2025
*Please note that this is an estimated timeline and is subject to change.